FURTHER READING
Read the quote before comparing the price
Separate official fees, professional work and costs that arise only if something happens.
Read current rules alongside the 2026 revision, effective 1 January 2027. New law and transition status · Update checked 27 November 2026.
Put the scope beside the total
Two quotes cannot be compared usefully if they cover different marks, classes or goods. Write down the exact sign, applicant, filing route, classes and item list first. If one quote combines elements and another proposes separate applications, ask for the reason and the effect on the scope.
Separate three kinds of cost
Official fees are charged by the relevant office for a procedure. Professional fees pay for the work a provider agrees to do. Other costs may include document procurement, translation, authentication or a payment charge where applicable. Ask which components are included, excluded or payable to someone else.
Ask what “filing included” means
A useful engagement description identifies the search and assessment, specification preparation, document work, submission and routine reporting included in the price. Ask how corrections, substantive refusals, oppositions and later proceedings are treated. A quoted filing service is not automatically an agreement to handle every dispute through to a final result.
Teaching example: a headline price and an all-in quote
Imagine Quote A lists an initial filing charge, while Quote B includes specification work and routine reporting. Neither is automatically better. Put both on the same worksheet and ask what happens if a notice requires extra work. Compare the expected scope and possible additions before deciding. No sample amount here represents an official tariff or a recommended market price.
Keep optional work separate
If priority is relevant, ask who obtains the foreign proof and who translates and submits it. If more products are added, ask whether new applications or additional work are required. Request the revised total and approve the scope before extra work starts.
Record currency and payment terms
Confirm the billing currency, whether official fees are already included, how any currency conversion is handled and when payment becomes due. Use the provider’s verified payment instructions. An invoice alone is not an official filing receipt; obtain the application reference after submission.
A comparison sheet you can reuse
For each offer, record: mark and format; goods and classes; filing route; included work; excluded proceedings; official-fee treatment; third-party expenses; currency; payment milestones; and communication arrangements. Keep the accepted quote with the final filing instructions.
Practical takeaway
Compare the work and protection scope behind the price. A low headline number does not describe the entire engagement.
Sources and edition notes
- WIPO · How to protect a trademark
- CNIPA · Trademark Law (2026 revision; effective 1 January 2027)
- CNIPA · Main changes in the 2026 revision (10 July 2026)
CNIPA fee reply dated 7 July 2026; CNIPA protection and enforcement guide, fee table. Amounts below concern ordinary national online applications accepting electronic communications, not Madrid designations, collective marks or certification marks.
Examination and opposition: 2019 Articles 28 and 33; 2026 Articles 32 and 36. The nine-month examination period remains; the new opposition period is two months. New law effective 1 January 2027. Official fee amounts are governed separately, not set by these provisions.
See the new-law overview for the enacted text and the separately labelled transition consultations. A consultation closing is not the same as a final rule being issued.
Original source dates apply to the relevant passages. Restored as further reading on 27 November 2026; this is not a new review of every underlying rule. Editorial approach.
Return to How much does it cost, and how long does it take? and related reading